Advertisement

Blockages force temporary shutdown of Energy from Waste Plant

by isleofman.com 2nd June 2017

Spot-checks to detect oversized items of waste delivered to the Energy from Waste Plant are set to increase in frequency following the third blockage at the facility in less than a week.

The Department of Infrastructure has highlighted the problems being experienced and said that it will explore options to recover additional costs.

The Energy from Waste Plant (EfW) is currently offline after a large tree stump, approximately 3ft in diameter, caused a blockage in the system.

Work is being carried out to resolve the issue and waste will continue to be received and temporarily stored at the site ahead of the planned start-up of the facility on Saturday 3 June.

Problems arise when non-conforming waste is delivered to the EfW plant, mainly in skips. This can include tree trunks and stumps and large pieces of metal, such as settee or bed frames. Blockages affect the ‘deslagging’ part of the process that quenches and clears the bottom ash and any unburnt, non-conforming waste.

Clearing blockages can take up to 48 hours and cost thousands of pounds as the plant must be cooled before engineers can safely access the blocked section.

The EfW plant was brought back online towards the end of May after a planned period of maintenance, but has been forced to shut down again on three separate occasions in the space of seven days because of blockages.

The operator of the EfW plant carries out spot-checks to identify items that should not be introduced to the incineration process. It is expected that these checks will be stepped up in a bid to prevent a repeat of the blockages experienced in recent days.

The Department has also indicated that it will look at recovering the additional costs associated with managing non-conforming wastes delivered to the plant.

Infrastructure Minister Ray Harmer MHK said: ‘Clearing a blockage can be a lengthy and costly exercise. The Energy from Waste Plant has to be shut down and allowed to cool before the offending items can be removed, which also disrupts the supply of electricity from the facility. I would urge people and businesses to act responsibly and not send any non-conforming waste to the site.’

Photo - Tree stump that caused the blockage.

Posted by isleofman.com
Friday 2nd, June 2017 01:45pm.

Popular Articles

Upcoming Events

Nobles Parkrun

A free, fun, and friendly weekly 5k community event in Nobles Park.  Walk, jog, run, volunteer or spectate...
3 May

Bridge Club

Monday is Bridge Day at the Onchan Pensioner's Social Club   We have two bridge clubs that meet on a weekly...
5 May
View More
Advertisement

You also might be interested in

Stephen Savage joins Quinn Legal’s Corporate and Commercial legal team.

Business

When the clocks sprung forward we lost another precious hour of sleep

Health & Wellness

The GFoGE guide to obstacle races & why should you do one.

Sports & Leisure

Why not take a "Wallaby" walk in the Curragh?

Nature & Wildlife

Hop-tu-Naa is an ancient festival celebrated on the Isle of Man

Visitor Guide

The Isle of Man hosts many traditional ceremonies throughout the year

Visitor Guide